
Pau Geli Vilardell
Multilingual professional with domestic and international experience in project management, procurement, consultancy and operations.
| 0 Followers | 0 Following | 60 Organizations | 18 Topics |
-
Coach & Talent S.L, Operations Engineer
February 2010 to September 2010
National staffing and logistics outsourcing firm.
• Successfully coordinated operations department.
• Administered various accounts and communicated directly with clients.
• Actively participated on making offers for new clients.
- Pricing and term negotiations
- Preparation and analysis of proposals
- Supplier selection
• Procurement and sourcing experience.
• Reduced company's core cost by 3%.
• Worked with IT consultants to implement a new IT system to improve tracking of distribution services.
• Analyzed roles in the company to assess the feasibility of expansion.
• Created a hiring procedure to increase effective communications between the Operations department and Human Resources.
• Created daily control system for efficient management of Hotel Chain janitorial group. -
C.B. Sant Josep Girona Men’s Basketball Team, Team Player
June 2009 to November 2009
-
University of Delaware, Research Engineer
February 2008 to May 2009
Influence of Nesting on ILSS of Epoxy/Glass Fiber Composites”
• Studied the influence of using different procedures when making samples.
• Gained experience on materials science.
• Implemented manufacturing process to make testable samples.
• Certified on laboratory safety rules.
• Analyzed and tested samples to quantify the effect nesting had on resistance of samples.
• Recognized on research paper for work on study (Science Direct).
“Influence of Nesting on ILSS of Epoxy/Glass Fiber Composites”
• Analyzed samples under optical microscope.
• Determined effect of fiber nesting on the ILSS of samples.
• Combined previous study to identify relationship between strength of samples and fiber nesting.
• Studied crack propagation amongst samples to determine reason of failure. -
GE Energy, Project Engineer
August 2008 to December 2008
• Worked with G. E. Energy on common project to improve manufacturing and mounting of solar panels on large scale, resulting in decreased mounting price by 60%.
• Gained experience on engineering team and meeting company specifications.
• Tested various design models to meet weather conditions and to ensure safety.
• Cost estimations and savings at a large scale solar panel arrays.
• Gained knowledge in electric standards for solar panels as well as manufacturing process.